The EcoMur module
Main product

A factory in a container

The EcoMur DFC™ module takes CO2 from flue gas as a raw material and forms building materials around the clock.

What arrives

Delivered by truck, connected to a duct

40-ft containerStandard size, standard transport.
About 100 m² of siteLevel, covered standing next to the stack.
Automated, 24/7Monitored remotely, serviced by our crew.
No foundationNo capital construction.

Inside

Six systems in two containers

The EcoMur module with see-through walls: the equipment inside both containers, from the straw bale at the inlet to the pallets of finished blocks

Swipe sideways to see the whole module

  1. 1
    Raw material storage and dosingStraw, lime and water in the right proportions.
  2. 2
    MixerPrepares an even mix for every cycle.
  3. 3
    Press with reaction chamberForms the material and carbonates it with flue gas.
  4. 4
    Gas systemOfftake, filtration and return of the gas to the stack.
  5. 5
    SensorsGas composition at the inlet and outlet, temperature, pressure.
  6. 6
    Control and remote monitoringThe line runs itself and reports every cycle.

What it makes

One module, different materials

This is what makes the module a platform, not a machine for one product.

Materials
EcoMur partition block
Construction

Building blocks

A better replacement for aerated concrete blocks.

Learn more
A hexagonal EcoMur panel
Interior

Decorative panels

Hexagonal panels that absorb CO2 from indoor air and even out humidity.

Learn more
Straw and lime insulation boards
Energy efficiency

Thermal insulation

Light insulation boards for walls and roofs.

Furniture made from boards
Furniture and fit-out

Boards

Boards to replace particleboard, MDF and plasterboard.

One module, one year

What a single module does in a year

over 1,000tCO2 taken out of flue gas
about 12,000m³of blocks
from 10%CO2 in the flue gas is enough
10mincycle
One working module with room for more beside it, straw bales and a site office

Scaling

One module makes a line. Ten make a plant.

Identical containers stand side by side with no redesign, with the same spare parts, training and documentation.

Getting started

From the first email to the first block

1

Gas analysis

Composition and volume of your flue gas.

2

Site selection

A spot next to the duct with access for a truck.

3

Delivery and connection

The module arrives and is tied into the duct.

4

Operation and service

The line runs, we monitor and maintain it.

How to get the module

Three parties, one line

For building materials producers who want to run the module and sell what it makes.

Industrial plant

Provides the site and the gas.

site and gas

Licensed producer

Runs the module and sells the materials.

technology and service

EcoMur

Technology, equipment through a manufacturing partner, software, training and service.

Request a licence offer

Tell us where you would run the module and what you would like to make. We will reply with an offer.