The Earth seen from space
About us

We fight global warming

EcoMur works on the decarbonisation of industry: we turn plant emissions into building materials. The EU market is changing under new rules for carbon-neutral construction, and Ukraine faces a vast reconstruction. Both need materials that keep carbon in the walls.

Decarbonising industryCO2 from plant stacks becomes a raw material instead of an emission.
New EU building rulesNew buildings in the EU move to zero emissions, and their whole life cycle carbon footprint now has to be counted.
Rebuilding UkraineHomes, schools and hospitals can be rebuilt with materials that store carbon instead of emitting it.
An industrial plant with smoking stacks at dusk

Mission

Industrial carbon should leave the plant as a product, not a problem.

Where we are

Prototypes built and tested. A pilot line is next.

We make samples on our own rig: a reaction mould fed with real exhaust gas, with sensors on every line.

Patent application filedPENDINGPENDINGPATENTLife cycle assessmentLIFE CYCLEASSESSMENTLCA
Watch the MVP video
  1. TodayPrototypes built and tested
  2. NextPilot line
  3. ThenA line next to an emitter
  4. After thatSerial automated module
A carbonated sample
Every sample is weighed
Reaction mould with gas feed
A finished panel

Interested? Write to us